Production Checksheets
TPR-F0496, Op Stamp 1
Operator - Setup Checks
Required at Setup Required each Shift
TPR-F0496, Op Stamp 1
In Process - Every Container
Required at Setup
Part Source

Manufactured

Building

Safety Meeting at 3pm

Job Note

Job Quantity

500.000 Ea

Produced

0.000

Due Date

10/5/2023

Balance Required

500.000

DR

0.000

Job Op Status

Started
Production Reports
Standard Crew Size: 2
  • Mike Arnott 4:06 PM Production
Job 8981
TPR-F0496-10 TPR powder coated Bracket Turbocharger 10 - Stamp 1 (720 Ea/hr)
Part
Press 1
250T Press
Next Workcenter
Next Workcenter Operation