Production Checksheets
22733521-B, Op Mold/Cure
Setup
Binning, Eric
7/26/2023, 8:27 AM
Required at Setup
22733521-B, Op Mold/Cure
In Process - 60 minute check
Quality
Binning, Eric
7/26/2023, 10:58 AM
Required Every: 60 Min
Part Source

Manufactured

Workcenter

Having trouble with the light curtain sensor.  Make sure the connector in the back is not loose.

Steve replaced heat sensor on 2nd shift. Seems good but be on lookout for any rise in temp.

 

QUALITY

- This and that

Building

Safety Meeting at 3pm

Job Note

Job Quantity

10,000.000 Ea

Produced

9,501.000

Due Date

3/20/2023

Balance Required

499.000

DR

0.000

Job Op Status

Completed
Production Reports
Standard Crew Size: 1
  • Christopher Bissell 9:49 AM Production
Job 8312
22733521-B-10 Key Fob - Front Shell 10 - Mold/Cure (360 Ea/hr)
Part
Workcenter 1
Workcenter One
Next Workcenter
Next Workcenter Operation